|
BEACON eSpace at Jet Propulsion Laboratory >
JPL Technical Report Server >
JPL TRS 1992+ >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/2014/39850
|
| Title: | Built but not used, needed but not built: ground system guidance based on Cassini-Huygens experience |
| Authors: | Larsen, Barbara S. |
| Keywords: | Cassini mission mission sequence subsystems telecommunications |
| Issue Date: | 19-Jun-2006 |
| Publisher: | Pasadena, CA : Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2006. |
| Citation: | AIAA 9th International Conference on Space Operations (SpaceOps), Rome, Italy, June 19-24, 2006. |
| Abstract: | These reflections share insight gleaned from Cassini-Huygens experience in supporting uplink operations tasks with software. Of particular interest are developed applications that were not widely adopted and tasks for which the appropriate application was not planned. After several years of operations, tasks are better understood providing a clearer picture of the mapping of requirements to applications. The impact on system design of the changing user profile due to distributed operations and greater participation of scientists in operations is also explored. Suggestions are made for improving the architecture, requirements, and design of future systems for uplink operations |
| URI: | http://hdl.handle.net/2014/39850 |
| Appears in Collections: | JPL TRS 1992+
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|