|
BEACON eSpace at Jet Propulsion Laboratory >
JPL Technical Report Server >
JPL TRS 1992+ >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/2014/32529
|
| Title: | Galileo Mission Planning for Low Gain Antenna Based Operations |
| Authors: | Gershman, R. Buxbaum, K. Ludwinski, J. Paczkowski, B. |
| Issue Date: | 14-Nov-1994 |
| Citation: | Space Ops 94 Greenbelt, Maryland, USA |
| Abstract: | The Galileo mission operations concept is undergoing substantial redesign while the spacecraft is on its way to Jupiter, necessitated by the deployment failure of the High Gain Antenna. |
| URI: | http://hdl.handle.net/2014/32529 |
| Appears in Collections: | JPL TRS 1992+
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|