|
|
BEACON eSpace at Jet Propulsion Laboratory >
Browsing by Date
Showing items 23190-23210 of 23960.
| Issue Date | Title | Author(s) |
| 14-Feb-2012 |
Level 2 Timing |
Smyth, Mike |
| 14-Feb-2012 |
The square kilometre array |
Lazio, Joseph |
| 15-Feb-2012 |
On-shore central hydraulic power generation for wind and tidal energy |
Jones, Jack A.; Bruce, Allan; Lim, Steven; Murray, Luke; Armstrong, Richard; Kimbrall, Richard; Cook-Chenault, Kimberly; DeGennaro, Sean |
| 15-Feb-2012 |
In-flight performance of the TES Loop Heat Pipe Rejection System : seven years in space |
Rodriguez, Jose I.; Na-Nakornpanom, Arthur |
| 15-Feb-2012 |
Target mode |
Natraj, Vijay; O’Dell, Chris; O’Brien, Denis |
| 16-Feb-2012 |
Use of the Deep Impact HRI instrument to observe exoplanets via microlensing |
Wissler, Steve; Bennett, David; Larson, Tim |
| 16-Feb-2012 |
Analysis of AIRS CO2 sensitivity to surface CO2 flux using GEOS-Chem adjoint model |
Liu, Junjie; Bowman, Kevin; Henze, Daven; Kalnay, Euenia; Fung, Inez; Kang, Ji-Sun; Olsen, Edward |
| 17-Feb-2012 |
The mission loads environment and structural design of the Mars Science Laboratory |
Structural Mechanics; Lee, Darlene |
| 18-Feb-2012 |
Likelihood-based climate model evaluation |
Braverman, Amy; Cressie, Noel; Teixeira, Joao |
| 20-Feb-2012 |
MISR 17.6 KM gridded cloud motion vectors: overview and assessment |
Mueller, Kevin; Garay, Michael; Moroney, Catherine; Jovanovic, Veljko |
| 21-Feb-2012 |
Euclid cosmological simulations requirements and implementation plan |
Kiessling, Alina |
| 22-Feb-2012 |
Orion flight test architecture benefits of MBSE approach |
Reed, Don; Simpson, Kim |
| 22-Feb-2012 |
New measurements for understanding the terrestrial water cycle |
Evans, Diane |
| 22-Feb-2012 |
Building communities of engineers to share technical expertise |
Topousis, Daria E.; Dennehy, Cornelius J.; Fesq, Lorraine M. |
| 22-Feb-2012 |
JPL Innovation Foundry |
Sherwood, Brent; McCleese, Daniel J. |
| 22-Feb-2012 |
Why good engineers give bad cost estimates : results of psychological research |
Garner, Jordan |
| 22-Feb-2012 |
Managing GRAIL: Launching on Cost, on Schedule, and on Spec |
Taylor, Randall L. |
| 22-Feb-2012 |
Ensuring the success of 5 NASA/JPL projects launched in 8 Months |
Zieger, Rod; Hunter, John |
| 22-Feb-2012 |
Building a cost effective portfolio management system : yes you can! |
Maleki, Linda; Trinh, Cindy |
| 24-Feb-2012 |
Earth Science at JPL |
Evans, Diane |
| 29-Feb-2012 |
Juno Instrument Data Pipeline Monitoring a.k.a. “Where’s My Data?" |
Jackson, Maddalena; Thornton, Marla |
|